EOI TITLE: A2209012/MPD – PROVISION OF INSPECTION SERVICES FOR SCHEDULED TURN-AROUND (“STA”) 2023 

WORK SCOPE:

 

The provision shall include but not limited to the provision of inspection services during the execution of STA 2023 with engineering period of thirty (30) days in May 2023. The scope shall be segregated as follows: 

 

LOCAL BUSINESS DEVELOPMENT (LBD)

 

1.    Pre-STA Activities
       Under pre-STA activities, the CONTRACTOR shall be required to provide the following items and/or services:


i.    Temporary facilities for CONTRACTOR’s personnel.
ii.   Review on maintenance and inspection work package requirement for the affected equipment plan for                          maintenance work in the shutdown turnaround.
iii.  Provision of fit for purpose inspectors of vary certifications and allocate QA/QC personnel throughout the                      engagement period.


2.    Execution of STA
       During STA period, CONTRACTOR shall be required to carry out the following services:

​

i.    Execution of inspection activities which shall include but not limited to:


a.    Visual internal and external inspection (VT)
b.    Ultrasonic wall thickness measurement (UT)
c.    Ultrasonic wall gauging or scanning (UTG)
d.    Dye penetrant inspection (DPT)
e.    Eddy-current testing (ECT)
f.    Magnetic particle Inspection (MPI)
g.    Radiographic testing (RT)
h.    Internal rotary inspection system (IRIS)
i.    Remote-field testing inspection (RFT)
j.    Borescope inspection
k.    Fiberscope inspection
l.    Pop test witnessing
m.    Hardness Testing
n.    Tube Vacuum Leak Testing
o.    Magnetic Flux Inspection (MFL)


ii.    Provision of required equipment during the execution of STA.

​

3.    Post-STA Activities
       As part of post-STA activities, CONTRACTOR shall be required to carry out the following services:


i.    Demobilisation and cleaning up of the worksite
ii.    Prepare and submit the close out reports. However, flash report must be delivered after inspection is immediately completed.

​

LOCAL BUSINESS DEVELOPMENT (LBD)

 

As per Guidelines set by the Department of Energy (DOE), this scope is categorised under the HIGHLY SPECIALIZED Quadrant of the LBD Framework. Hence, this EOI is: 

​

â–ª    Open to all companies;
â–ª    Local Employment target – Best endeavours; and
â–ª    Local Content target – Best endeavours.

​​

Interested parties are expected to be fully aware and familiar with the directives and guidelines issued which can be found at the web address below:  
Directive 2 on Local Business Development Framework for the Oil & Gas Industry 

 

TENDER/CONTRACT SCHEDULE

 

â–ª    Planned tender date: October 2022
â–ª    Contract Duration: Ten (10) months

 

INSTRUCTIONS TO PARTICIPATE IN EOI 

​

To confirm interest in provision of the scope, interested parties are instructed as follows:

1.    Complete the questionnaires which can be found and downloaded using the following link:

https://www.dropbox.com/sh/luv14ia4sn27zqt/AADqX6TClSCPiQanzRYmNT66a?dl=0

2.    Deadline for submission of EOI:  1600 hours, 23 September 2022
3.    All submission shall be submitted electronically via email to: Tenders_EOI@brunei-methanol.com
4.    Interested party is required to mark its submission clearly as: A2209012/TED – PROVISION OF INSPECTION SERVICES FOR SCHEDULED TURN-AROUND 2023

​

ANY SUBMISSIONS RECEIVED LATER THAN THE SPECIFIED DATE AND TIME MAY BE REJECTED.

Interested party/ies to note that NO COMMERCIAL SUBMISSIONS to be included in the EOI submission.  Inclusion of any such material shall be rejected.

 

Note: This EOI shall not be deemed to be an invitation to tender. BMC shall have the right and sole discretion to reject any part or all of the response made by the interested party. BMC shall have the right and sole discretion to determine the bidders for this tender. This letter serves solely for the purpose of obtaining EOI and shall neither in any way be construed as to create any legal obligation on the parties responding to this advertisement nor mentioned herein. Expenses incurred in connection to this shall be borne in its entirety by the interested parties.

bottom of page